Municipal Plant Realizes Substantial Savings in Energy, Waste, and Chemical Costs
By conducting a site audit and an Avista Membrane Autopsy, we guided and directed the required system changes to realize substantial savings in energy, waste, and chemical costs.
The outcome of this cleaning study resulted in:
• An annual energy savings of $7,296.
• An estimated membrane replacement savings of $50,400 (for one train).
• An estimated annual savings of $1,200, due to the reduction of cleaning frequency (down from 3-4 times per year) because of stabilized fouling rates.
Download our full case study to learn more.
Case Study
Municipal Plant Realizes Substantial Savings in Energy, Waste, and Chemical Costs
Download Case Study
Let us help you optimize your membrane system.
Contact Avista Technical Support
Sustainable Solutions for Optimal Membrane Treatment
August 1, 2024
Avista Technologies, Inc. Celebrates its 25th Anniversary in Membrane Treatment Solutions
April 2, 2024
Municipal Water Plant Realizes System Optimization and Savings in Energy and Membrane Replacement
March 20, 2024
Enhancing TMP Recovery through CIP Efficiency
January 12, 2024
Reflections on Leadership with Avista’s CEO, Toshi Maema
December 18, 2023